Correction: A Difference-In-Differences Study of the Effects of a New Abandoned Building Remediation Strategy on Safety

PLoS One. 2015 Aug 20;10(8):e0136595. doi: 10.1371/journal.pone.0136595. eCollection 2015.
No abstract available

Publication types

  • Published Erratum